Equipment Utilization Efficiency Evaluation Aiming at Power Grid Capacity Optimization and Its Application

Lingyi WANG , Yunpeng CHEN , Zhimin WANG , Hong ZHANG

›› 2016, Vol. 10 ›› Issue (11) : 73 -78.

PDF
›› 2016, Vol. 10 ›› Issue (11) : 73 -78. DOI: 10.13648/j.cnki.issn1674-0629.2016.11.011
research-article

Equipment Utilization Efficiency Evaluation Aiming at Power Grid Capacity Optimization and Its Application

Author information +
History +
PDF

Abstract

It is of great practical significance to establish the evaluation system of power equipment utilization efficiency aiming at power grid capacity optimization for collaboration of power grid planning and construction. An evaluation system of power equipment utilization efficiency aiming at power grid capacity optimization is introduced. Four major evaluation indices, including capacity-load ratio, maximum load rate, annual equivalent mean load rate and annual mean utilization time, and power grid capacity optimization limits are given. Considering the key factors influencing utilization efficiency, and a capacity optimization method is adopted to enhance the overall utilization efficiency. Case study in Yunnan power grid verifies the reasonability and effectiveness of the evaluation system and the optimization method proposed in this paper.

Keywords

power grid capacity optimization / power grid planning collaboration / evaluation index / utilization efficiency

Cite this article

Download citation ▾
Lingyi WANG,Yunpeng CHEN,Zhimin WANG,Hong ZHANG. Equipment Utilization Efficiency Evaluation Aiming at Power Grid Capacity Optimization and Its Application. 2016, 10(11): 73-78 DOI:10.13648/j.cnki.issn1674-0629.2016.11.011

登录浏览全文

4963

注册一个新账户 忘记密码

References

PDF

10

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/