Abstract

Based on typical structure of voltage source converter based HVDC (VSC-HVDC) station and its parameters, the impact of startup process of VSC-HVDC station on AC grid is analyzed in this paper. According to the characteristic of voltage and current during station startup, it is concluded that AC grid voltage might drop abruptly because of transformer excitation inrush current or incomplete charge of DC capacitors at the time of closing AC circuit breaker or bypassing charging resistor. A control method to avoid the voltage drop of AC grid is proposed which decreases over current through phase selection switchs and delayed charging resistor bypassing. The method is verified through simulations based on real VSC-HVDC station.

Keywords

voltage source converter based HVDC (VSC-HVDC) / excitation inrush current / modular multi-level converter (MMC) / converter station

Cite this article

Download citation ▾
Hui HUANG,Zhichang YUAN,Songguang ZHANG,Jie LI. Impact of Startup Process of VSC-HVDC Station on AC Power Grid Voltage. 2017, 11(1): 23-29 DOI:10.13648/j.cnki.issn1674-0629.2017.01.004

登录浏览全文

4963

注册一个新账户 忘记密码

References

Funding

Science and Technology Project of Guangdong Power Grid Co., Ltd.(GD201420295)

PDF

10

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/