Parameter Feasible Region Construction for Voltage-Source Transient Synchronization Stability of Grid-Forming Energy Storage System Under Faults

Xialin LI , Yuxuan LUO , Yeyun XIANG , Jingliao SUN , Honglei XI , Bangguang HOU , Zhi WANG

›› 2026, Vol. 20 ›› Issue (9) : 25 -36.

PDF (2798KB)
›› 2026, Vol. 20 ›› Issue (9) : 25 -36. DOI: 10.13648/j.cnki.issn1674-0629.2026.09.003
research-article

Parameter Feasible Region Construction for Voltage-Source Transient Synchronization Stability of Grid-Forming Energy Storage System Under Faults

Author information +
History +
PDF

Abstract

The national standard “Technical Specification for Grid-Forming Converters in Electrochemical Energy Storage Systems” (draft for comments) requires grid-forming energy storage system (GFM-ESS) to achieve long-duration low-voltage ride-through and transient synchronization stability under faults. To quantify this capability, a parameter feasible region construction method is proposed for maintaining voltage-source characteristics and synchronization stability under GFM-ESS sustained faults. Firstly, a fault-current engineering calculation method considering electromagnetic transient process is developed to obtain the transient current peak and steady-state AC component as current constraints. Then, an energy function incorporating virtual impedance and equivalent damping coefficient is constructed as the synchronization stability constraint, while the feasible active-power reference range is used as the equilibrium-point constraint. On this basis, an expression is derived for the parameter set that enables the GFM-ESS to maintain voltage-source transient synchronization stability under faults. The feasible region is further characterized using the active-power reference and virtual reactance as key parameters, thereby quantitatively determining the stable operating boundary of the GFM-ESS. Finally, the effects of various grid-side and device-side parameters on the feasible region boundaries, together with their underlying mechanisms, are quantitatively analyzed, and electromagnetic transient simulations are conducted to verify the effectiveness of the constructed feasible region.

Keywords

grid-forming energy storage / parameter feasible region / voltage-source transient synchronization stability / energy function / fault current engineering calculation

Cite this article

Download citation ▾
Xialin LI,Yuxuan LUO,Yeyun XIANG,Jingliao SUN,Honglei XI,Bangguang HOU,Zhi WANG. Parameter Feasible Region Construction for Voltage-Source Transient Synchronization Stability of Grid-Forming Energy Storage System Under Faults[J]. Southern Power System Technology, 2026, 20(9): 25-36 DOI:10.13648/j.cnki.issn1674-0629.2026.09.003

登录浏览全文

4963

注册一个新账户 忘记密码

References

Funding

the National Key Research and Development Program of China(2023YFB2406700)

the National Natural Science Foundation of China(52477118)

the Science and Technology Project of State Grid Zhejiang Electric Power Co., Ltd(5211WZ26000G)

PDF (2798KB)

225

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/

〈 〉